日韩在线网站免费观看-久久天天躁狠狠躁夜夜躁-超碰在线免费公开观看-国产精品丝袜久久久久久不卡-六月丁香婷婷久久爱-caopor超碰人妻97中出-一区二区人妻有码-成人精品在久久这里-精品乱子升伦一区二区三区熟女,亚洲国产成人高潮高清视频,17分钟视频一区二区三区,99精品视频在线播放

Mounting steps for silicon carbide bushing

點(diǎn)擊次數(shù):   更新時(shí)間:16/07/19 08:30:07     來(lái)源:m.iiii17.com關(guān)閉分    享:
Before installation, the silicon carbide liner must be carefully cleaned with the surface of the shaft seal. Here is a brief introduction to the installation steps of silicon carbide bushing:
(1) the surface of the seal on the cleaning shaft. Remove any burrs or rough spots, ensure that Bush did not install in the keyway, cross hole, spline or other similar places.
(2) measurement of the shaft not wear part, is about to install the diameter of the Bush position. In three position measurements, the arithmetic mean is taken to ensure that the size of the shaft is within the recommended specification. If the average diameter is in the range of the given bushing size, the bushing will have enough surplus with the shaft so that the adhesive is not required and can prevent the bushing from sliding or rotating on the shaft.
(3) to determine the location of the bushing to be installed, and must cover the wear area. Measure the exact point, or directly on the surface to make a mark. Bushings must be placed in the wear area, not just on the bottom or left axis and flush the place.
(4) the shallow wear groove does not need to be filled. In addition, a very thin layer of soft sealant can be used for the inner surface of the bush. Remove sealant, move to the shaft or the surface of the outer bushing.
(5) if the axial depth of scratches, groove filled with epoxy powder filler metal. Install the bushing in the filler before hardening, the bushing can wipe off excess filler. Remove any residual filler bushing surface.
(6) reiterated that the heating method can not be used for wear resistant bushing installation.
(7) if the installation is required to remove the flange, the flange diameter should be cut to the arc. The flange end of the bushing is installed on the shaft first, and then the installation tool is placed on the bushing.
(8) light tap mounting tool until the bushing covers the worn surface. If the installation tool is too short, can use a long tube without burr or square at the end of the bobbin. Make sure that the diameter of the pipe is the same as the diameter of the installation tool. Be careful not to scratch the outer diameter of the precision grinding bush.
(9) wear resistant bushing should always be installed so that the edges of the bushing will be installed on the shaft. Edge can not be extended or beyond the shaft chamfering part, because in seal installation process, the sharp edges may cut the sealing lip.
(10) to dismantle the flange, first using pointed nose pliers to flange and pull up and then use pliers and rolled up until the pull down. Be careful not to pull the end of the bushing along the axis, so that it will leave a jagged edge.
(11) after the installation of the bushing, once again to verify whether there will be damage to the sealing parts of the burr.
(12) install the sealing parts before using the system medium lubrication bushing.
(13) seal installation.
上一條:沒(méi)有了
下一條:沒(méi)有了


濰坊新創(chuàng)新材料科技有限公司

   聯(lián)系人:李經(jīng)理
   手機(jī):15628717999
   地址:濰坊市坊子區(qū)濰州南路張家柳溝村北
英德市| 确山县| 虹口区| 淮安市| 河北区| 博白县| 唐山市| 浦城县| 高唐县| 南乐县| 临江市| 邹平县| 茌平县| 尚义县| 太原市| 广西| 防城港市| 长兴县| 正蓝旗| 囊谦县| 厦门市| 府谷县| 桐柏县| 洪雅县| 明水县| 灵台县| 九台市| 营山县| 长治县| 海林市| 灵宝市| 江西省| 贺州市| 新蔡县| 郸城县| 漳浦县| 建德市| 西乌珠穆沁旗| 河南省| 罗城| 铜梁县|